Solution to Job Shop Scheduling Problem using Hybrid Genetic Swarm Optimization based on (?,1) Fuzzy Processing Time
Material type:
TextLanguage: English Publication details: 2011Subject(s): DDC classification: - JNEE11-669
| Item type | Current library | Collection | Call number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Institutional repository | Central Library Central Library | EE | JNEE11-669 (Browse shelf(Opens below)) | Available | IR669 |
Browsing Central Library shelves, Shelving location: Central Library, Collection: EE Close shelf browser (Hides shelf browser)
There are no comments on this title.
Log in to your account to post a comment.
